{"id":8296,"date":"2026-05-28T15:06:29","date_gmt":"2026-05-28T15:06:29","guid":{"rendered":"https:\/\/www.cavendishnuclear.com\/?p=8296"},"modified":"2026-05-28T15:06:32","modified_gmt":"2026-05-28T15:06:32","slug":"cavendish-nuclear-awarded-strategic-edf-and-sizewell-c-frameworks-role-powering-uks-clean-energy-future","status":"publish","type":"post","link":"https:\/\/www.cavendishnuclear.com\/jp\/news\/cavendish-nuclear-awarded-strategic-edf-and-sizewell-c-frameworks-role-powering-uks-clean-energy-future\/","title":{"rendered":"Cavendish Nuclear Awarded Strategic EDF and Sizewell C Frameworks Role Powering UK\u2019s Clean Energy Future"},"content":{"rendered":"<p>Cavendish Nuclear, a wholly owned subsidiary of Babcock International Group, has been selected for three Professional Services Agreements (PSAs), through EDF Nuclear Generation, Hinkley Point C and Sizewell C, strengthening its role in supporting the UK\u2019s nuclear energy programme and new nuclear build.<\/p>\n\n\n\n<p>The agreements, which run for five years, with an opportunity to extend for a further five, underline Cavendish Nuclear as a trusted delivery partner across both EDF and Sizewell C. The framework provides a fast-track route to deliver critical services without the need for repeated tendering, enabling greater efficiency, agility, and collaboration across the programmes.<\/p>\n\n\n\n<p>This includes the maintenance of EDF\u2019s existing nuclear generating reactors and support to Hinkley Point C, as well as contributing to the safe and efficient delivery of Sizewell C &#8211; a cornerstone project in the UK Government\u2019s strategy to achieve energy security and deliver net zero.<\/p>\n\n\n\n<p>The award reflects Cavendish Nuclear\u2019s proven expertise across more than 60 specialist disciplines, spanning engineering and technical services, construction, quality, safety, security and assurance, commissioning, programme management and business support.<\/p>\n\n\n\n<p>James Ewence, Cavendish Nuclear\u2019s Business Director for Clean Energy said: <em>\u201cThis framework recognises the depth of capability and our commitment to supporting the UK\u2019s nuclear programme and underpinning the nation\u2019s clean energy ambitions. It enables us to continue to work closely with EDF, both Existing Generation and Hinkley Point C, and Sizewell C, playing a key role in delivering secure, low carbon energy and positioning us as a long-term partner of choice for the UK\u2019s nuclear future.\u201d<\/em><\/p>\n\n\n\n<p>Cavendish Nuclear continues to support EDF at Hinkley Point C, with a workforce of more than 900. In parallel, the organisation provides specialist capability to EDF\u2019s existing nuclear generation fleet and is also collaborating with Sizewell C to help shape the project.<\/p>","protected":false},"excerpt":{"rendered":"<p>Cavendish Nuclear, a wholly owned subsidiary of Babcock International Group, has been selected for three Professional Services Agreements (PSAs), through EDF Nuclear Generation, Hinkley Point C and Sizewell C, strengthening its role in supporting the UK\u2019s nuclear energy programme and new nuclear build. The agreements, which run for five years, with an opportunity to extend &#8230; <a title=\"Cavendish Nuclear Awarded Strategic EDF and Sizewell C Frameworks Role Powering UK\u2019s Clean Energy Future\" class=\"read-more\" href=\"https:\/\/www.cavendishnuclear.com\/jp\/news\/cavendish-nuclear-awarded-strategic-edf-and-sizewell-c-frameworks-role-powering-uks-clean-energy-future\/\" aria-label=\"Read more about Cavendish Nuclear Awarded Strategic EDF and Sizewell C Frameworks Role Powering UK\u2019s Clean Energy Future\">Read more<\/a><\/p>","protected":false},"author":8,"featured_media":8294,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-8296","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.cavendishnuclear.com\/jp\/wp-json\/wp\/v2\/posts\/8296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cavendishnuclear.com\/jp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cavendishnuclear.com\/jp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cavendishnuclear.com\/jp\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cavendishnuclear.com\/jp\/wp-json\/wp\/v2\/comments?post=8296"}],"version-history":[{"count":0,"href":"https:\/\/www.cavendishnuclear.com\/jp\/wp-json\/wp\/v2\/posts\/8296\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cavendishnuclear.com\/jp\/wp-json\/wp\/v2\/media\/8294"}],"wp:attachment":[{"href":"https:\/\/www.cavendishnuclear.com\/jp\/wp-json\/wp\/v2\/media?parent=8296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cavendishnuclear.com\/jp\/wp-json\/wp\/v2\/categories?post=8296"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cavendishnuclear.com\/jp\/wp-json\/wp\/v2\/tags?post=8296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}