Sellafield (Product and Residue Store) Retreatment Plant Project

The mission is to provide a facility that will receive special nuclear material (SNM) from existing stores on the Sellafield site and process it into a form suitable for safe and suitable storage until 2120.

The project has taken the client requirements, assessed and selected the most cost effective and timely solution in concept design and developed the engineering maturity through preliminary and detailed design.

Cavendish Nuclear has developed a fully integrated, multi-discipline design team via the Progressive Design Services Alliance. This team is co-located with the client team and provides in the region of 200 engineering and technical experts focussed on achieving the optimum technical solution. The Engineering team is set to work by our highly experienced programme control and management professionals.

Customer
Sellafield Ltd
Site
Sellafield, Cumbria
Value
~£100 Million
Duration
2015 -2023
Capabilities
Decommissioning and Waste Management